36.8 percent increase for IMM student residences
At the Istanbul Metropolitan Municipality (IMM) Assembly, it was decided that the monthly fee in higher education student dormitories, which is 950 lira, will be 1,300 lira, an increase of 36.84 percent.
The third session of the September IMM Assembly was held at the Saraçhane Municipal Building under the chairmanship of the Second Vice President of the Assembly, Ömer Faruk Kalaycı.
The revised fee schedule for 2023 of the Revenue Directorate of the Department of Financial Services of IMM was discussed in Parliament.
27.65 PERCENT INCREASE IN DAY CARE FEE
The proposal requested that the monthly fee for IMM’s Istanbul Yuvamiz Kindergarten, which is 940 lira, be increased by 27.65 percent to 1,200 lira, and that the monthly fee for dormitories for education students higher, which is 950 liras, will be increased by 36.84 percent to 1,300 liras.
In the revised proposal, it was also requested that the fee for using toilets in the city be increased from 1 lira to 2 lira.
The article thus voted was accepted unanimously.
The increases will be in effect starting this month.
IT’S ALSO TIME FOR WATER
At the ordinary meeting of İSKİ held at the Istanbul Metropolitan Municipality Assembly, it was announced that the price of water increased by 25 percent. The last increase in water prices was 13 percent in June.
According to the news from Özlem Güvemli from Sözcü, with the new tariff, the unit price of the first stage between 0 and 15 cubic meters in residences increased from 16.50 TL to 20.62 TL.
The unit price of the second stage between 15 and 30 cubic meters increased from 23.75 TL to 29.68 TL, and the unit price of the third stage of 30 cubic meters and more increased from 32.34 TL to 40.42 TL .
In places that have become neighborhoods by law and in rural neighborhoods, the unit price of housing increased from 4.12 TL to 5.15 TL, the common meter of housing/house construction site increased from 23, 75 TL to 29.68 TL, the first level of the workplace (0-40 cubic meters) increased from 43.23 TL to 54.03 TL, and the second stage workplace (43 cubic meters and above) increased from 50 TL to 62.5 TL. (SÖZCÜ-AA)